• About
  • Advertise
  • Privacy & Policy
  • Contact
Thursday, July 16, 2026
Visit Mawphor
Highland Post
Govt. of Meghalaya
  • Home
  • Meghalaya
    • All
    • East Garo Hills
    • East Jaintia Hills
    • East Khasi Hills
    • Eastern West Khasi Hills
    • North Garo Hills
    • Ri Bhoi
    • South Garo Hills
    • South West Garo Hills
    • South West Khasi Hills
    • Statewide
    • West Garo Hills
    • West Jaintia Hills
    • West Khasi Hills
    Filling works begin along NH 6 after protest

    Slope stabilisation efforts on to prevent landslides along NH 6: NHAI to High Court

    Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

    Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

    Crematoriums inaugurated in Jalaphet

    46 crematorium sites identified in four districts

    NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

    NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

    Govt, stakeholders study reintegration for addicts

    Govt, stakeholders study reintegration for addicts

    NDMA asses river erosion mitigation projects in West Khasi Hills

    NDMA asses river erosion mitigation projects in West Khasi Hills

    El Niño awareness programme held for farmers in Ri Bhoi

    El Niño awareness programme held for farmers in Ri Bhoi

    Three children electrocuted to death by high voltage wire

    Three children electrocuted to death by high voltage wire

    BJP-NPP alliance intact: Hek

    No places of worship in Govt offices: Hek

    Trending Tags

    • North East
    • National
      Govt ‘cruel’ for ignoring Wangchuk’s fast, says Dipke, as activist enters Day 18 of hunger strike

      Govt ‘cruel’ for ignoring Wangchuk’s fast, says Dipke, as activist enters Day 18 of hunger strike

      Women’s quota, delimitation bills will be passed in Monsoon Session: Athawale

      Women’s quota, delimitation bills will be passed in Monsoon Session: Athawale

      EC ready for ‘One Nation One Election’ with 6-month notice: Par panel chief

      EC ready for ‘One Nation One Election’ with 6-month notice: Par panel chief

    • Health
    • Editorial
    • Sports
    • Writer’s Column
    • Letters to the Editor
    No Result
    View All Result
    • Home
    • Meghalaya
      • All
      • East Garo Hills
      • East Jaintia Hills
      • East Khasi Hills
      • Eastern West Khasi Hills
      • North Garo Hills
      • Ri Bhoi
      • South Garo Hills
      • South West Garo Hills
      • South West Khasi Hills
      • Statewide
      • West Garo Hills
      • West Jaintia Hills
      • West Khasi Hills
      Filling works begin along NH 6 after protest

      Slope stabilisation efforts on to prevent landslides along NH 6: NHAI to High Court

      Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

      Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

      Crematoriums inaugurated in Jalaphet

      46 crematorium sites identified in four districts

      NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

      NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

      Govt, stakeholders study reintegration for addicts

      Govt, stakeholders study reintegration for addicts

      NDMA asses river erosion mitigation projects in West Khasi Hills

      NDMA asses river erosion mitigation projects in West Khasi Hills

      El Niño awareness programme held for farmers in Ri Bhoi

      El Niño awareness programme held for farmers in Ri Bhoi

      Three children electrocuted to death by high voltage wire

      Three children electrocuted to death by high voltage wire

      BJP-NPP alliance intact: Hek

      No places of worship in Govt offices: Hek

      Trending Tags

      • North East
      • National
        Govt ‘cruel’ for ignoring Wangchuk’s fast, says Dipke, as activist enters Day 18 of hunger strike

        Govt ‘cruel’ for ignoring Wangchuk’s fast, says Dipke, as activist enters Day 18 of hunger strike

        Women’s quota, delimitation bills will be passed in Monsoon Session: Athawale

        Women’s quota, delimitation bills will be passed in Monsoon Session: Athawale

        EC ready for ‘One Nation One Election’ with 6-month notice: Par panel chief

        EC ready for ‘One Nation One Election’ with 6-month notice: Par panel chief

      • Health
      • Editorial
      • Sports
      • Writer’s Column
      • Letters to the Editor
      No Result
      View All Result
      Highland Post
      No Result
      View All Result
      Home Writer's Column

      The Dawki–Lailyngkot Road: An Opportunity to Build for the Future

      HP News Service by HP News Service
      July 16, 2026
      in Writer's Column
      0
      Shillong-Dawki road to close for 3 days

      A section of the Shillong-Dawki Road lies buried under earth and rock. This particular stretch is particularly dangerous and has claimed the lives of several people in the last few years, especially during periods of rainy weather, which loosens the earth along the road's route. Photo Contributed

      0
      SHARES
      6
      VIEWS

      By Arun Kumar Banerjee

      The widening of the Dawki–Lailyngkot road is one of the most significant infrastructure projects presently underway in Meghalaya. It promises to improve connectivity between Shillong and Dawki, facilitate tourism, and strengthen cross-border trade with Bangladesh. The project therefore deserves appreciation as an important investment in the State’s future.

      However, every large engineering project also offers an opportunity to ask an important question: Are we building merely for today, or are we building to last for decades?

      A road is not merely a strip of asphalt connecting two places. It is a dialogue between gravity, water, rock and human judgment. The better we understand the conversation, the longer the road will endure.

      Having spent many years supervising civil construction works, I have observed certain aspects of the ongoing work that deserve thoughtful discussion.

      The route passes through one of the most beautiful but geologically sensitive regions of the Khasi Hills. Mountain roads are unlike roads in the plains. They must continuously contend with gravity, intense rainfall, groundwater seepage and weathering of rock. Unless these natural forces are respected, maintenance costs increase and road life decreases.

      One aspect that deserves closer attention is drainage. Water is often the greatest enemy of a road. A well-designed drainage system should intercept surface runoff before it reaches the pavement, rapidly remove water from cut slopes and prevent seepage beneath the carriageway. Every monsoon reminds us that inadequate drainage can undo months of expensive construction.

      Many retaining walls fail not because they are too weak, but because hydrostatic pressure builds up behind them. A dry wall mainly resists the weight of soil; a waterlogged wall must also resist the force of trapped water. This is why drainage holes and subsurface drains are not optional extras—they are integral to the structural design.

      Similarly, the stability of cut slopes deserves careful consideration. Cutting a hill alters the natural balance of forces acting within the rock and soil. Appropriate slope geometry, retaining structures where required, proper benching and vegetation can significantly reduce erosion and improve long-term stability.

      One engineering feature that deserves wider use in mountain highways is the French drain. Unlike ordinary roadside drains that remove only surface water, a French drain is designed to intercept groundwater before it reaches the road structure. It consists of a trench filled with graded gravel surrounding a perforated pipe, all wrapped in a geotextile fabric that prevents clogging. Water seeps naturally into the gravel, enters the pipe and is safely carried away. By lowering the water table around the road and preventing seepage into the pavement and embankment, French drains significantly improve slope stability, reduce pavement damage and prolong the life of the highway. Although they involve a modest additional cost during construction, they often pay for themselves many times over through reduced maintenance and increased durability.

      Knowing Meghalaya’s climate, I would suggest that every cut slope be viewed as a watershed rather than merely a hill face. Rainwater falling on the slope does not simply disappear—it infiltrates, percolates through joints in the rock, and eventually emerges where it can weaken the pavement or destabilize the slope. A French drain acts as a pressure relief system, intercepting this hidden groundwater before it becomes a problem.

      Another issue concerns quality control during construction. Modern road engineering depends not only upon good design but also upon strict adherence to construction practices. Proper proportioning of concrete, adequate compaction, vibration wherever required, curing and systematic quality testing together determine the durability of the finished work. Even small deviations during construction may lead to premature deterioration.

      It is important to emphasise that these observations are not intended as criticism of any particular agency or contractor. Rather, they arise from the belief that public infrastructure should deliver maximum value over its intended life. Every additional year of service obtained from a road represents savings to the public exchequer and fewer disruptions to commuters.

      The Dawki–Lailyngkot road has the potential to become one of Meghalaya’s showcase highways. By combining sound engineering with rigorous quality assurance and careful environmental management, it can remain safe, durable and economical for many years.

      As citizens, engineers and users of this road, we all share a common objective—to ensure that this investment becomes a lasting asset for future generations.

      (The writer is a Life Member of the Indian Institute of Physics teachers)

      HP News Service

      HP News Service

      An English daily newspaper from Shillong published by Readington Marwein, proprietor of Mawphor Khasi Daily Newspaper, who established the first Khasi daily in 1989.

      Related Posts

      The battle for ballot in the North-East
      Writer's Column

      Why are we still not on track to end TB despite decades of scaling up TB services?

      July 16, 2026
      The battle for ballot in the North-East
      Writer's Column

      Politics: A View from the Inside

      July 15, 2026
      The battle for ballot in the North-East
      Writer's Column

      The Rangbah Shnongs (Headmen) & the KHADC Bill

      July 14, 2026
      The battle for ballot in the North-East
      Writer's Column

      Diengsympat: An Icon of Love

      July 12, 2026
      The battle for ballot in the North-East
      Writer's Column

      NO to Arrange Marriages

      July 12, 2026
      The battle for ballot in the North-East
      Writer's Column

      A Commentary of Khasi Folklore- 27

      July 10, 2026
      Load More
      Next Post
      Govt, stakeholders study reintegration for addicts

      Govt, stakeholders study reintegration for addicts

      Leave a Reply Cancel reply

      Your email address will not be published. Required fields are marked *

      We’re on Facebook

      Advertisement

      • Trending
      • Comments
      • Latest
      Sonam & Raja were with 3 other tourists on day they vanished, says tour guide

      Sonam & Raja were with 3 other tourists on day they vanished, says tour guide

      June 7, 2025
      Tourist taxi association launches agitation against outside vehicles

      Tourist taxi association launches agitation against outside vehicles

      September 17, 2025
      Residents of 44 localities in Shillong drink unsafe water

      Residents of 44 localities in Shillong drink unsafe water

      October 3, 2023
      Bike taxi drivers ask Govt for offline option

      Rapido captains caught off guard by DTO, hired and fined

      July 7, 2024
      Local cabbies disagree with disruption of tourists’ entry

      Assam taxi operators warn of dire effects of ban from tourist sites

      1

      Illegal sand, boulder mining along Umiam River banned

      0

      WINS project launched at Loreto School

      0
      Filling works begin along NH 6 after protest

      Slope stabilisation efforts on to prevent landslides along NH 6: NHAI to High Court

      0
      Filling works begin along NH 6 after protest

      Slope stabilisation efforts on to prevent landslides along NH 6: NHAI to High Court

      July 16, 2026
      Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

      Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

      July 16, 2026
      Crematoriums inaugurated in Jalaphet

      46 crematorium sites identified in four districts

      July 16, 2026
      NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

      NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

      July 16, 2026

      Recommended

      Filling works begin along NH 6 after protest

      Slope stabilisation efforts on to prevent landslides along NH 6: NHAI to High Court

      July 16, 2026
      Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

      Ri-Bhoi steps up efforts to tackle recurring Jorabat-Khanapara flooding

      July 16, 2026
      Crematoriums inaugurated in Jalaphet

      46 crematorium sites identified in four districts

      July 16, 2026
      NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

      NEC releases Rs 13.58 cr for health, connectivity, energy & community infra

      July 16, 2026

      About Highland Post

      You’re visiting the official website of Highland Post, a leading and most circulated English daily of Meghalaya published by the Mawphor Group. Stay updated with our e-edition for latest updates from Meghalaya, North Eastern India and World as a whole.

      Registered office:
      Mavis Dunn Road, Mawkhar,
      Shillong-793001, Meghalaya
      Phone no: 0364-2545423
      Email: highlandpost.shg@gmail.com, editorhp2019@gmail.com

      Like Us on Facebook

      Follow Us on Twitter

      Tweets by HP

      © 2021 Highland Post – All Rights Reserved.

      • About
      • Advertise
      • Privacy & Policy
      • Contact
      No Result
      View All Result
      • Home
      • Meghalaya
        • East Garo Hills
        • East Jaintia Hills
        • East Khasi Hills
        • North Garo Hills
        • Ri Bhoi
        • South Garo Hills
        • South West Garo Hills
        • South West Khasi Hills
        • Statewide
        • West Garo Hills
        • West Jaintia Hills
        • West Khasi Hills
      • North East
      • National
      • International
      • Health
      • Editorial
      • Musey Toons
      • Sports
      • Writer’s Column
      • Letters to the Editor

      © 2021 Highland Post - All Rights Reserved.