• About
  • Advertise
  • Privacy & Policy
  • Contact
Tuesday, June 23, 2026
Visit Mawphor
Highland Post
Govt. of Meghalaya
  • Home
  • Meghalaya
    • All
    • East Garo Hills
    • East Jaintia Hills
    • East Khasi Hills
    • Eastern West Khasi Hills
    • North Garo Hills
    • Ri Bhoi
    • South Garo Hills
    • South West Garo Hills
    • South West Khasi Hills
    • Statewide
    • West Garo Hills
    • West Jaintia Hills
    • West Khasi Hills
    No quick fix to Shillong-Dawki Road collapse

    No quick fix to Shillong-Dawki Road collapse

    Large chunk of Shillong-Dawki Road washed away

    Pynursla BDO warns of further landslides

    Biam ends hunger strike; warns fight for coal mining will intensify

    Biam ends hunger strike; warns fight for coal mining will intensify

    Titos stands behind UDP cabinet musical chairs

    Members come & go but UDP remains strong: Titos

    Government appoints inquiry officer into GHADC issue

    Bernard calls for restoration of autonomy in GHADC

    Bigger Megh House in Vellore to replace current dilapidated facility

    Bigger Megh House in Vellore to replace current dilapidated facility

    College of Community Science transfers food processing technologies to Prime Meghalaya

    College of Community Science transfers food processing technologies to Prime Meghalaya

    Upper Shillong headmen oppose land grant to non-tribal

    NGOs ask for permanent SDO in Dadenggre

    DPDC reviews development initiatives in SWGH

    DPDC reviews development initiatives in SWGH

    Trending Tags

    • North East
    • National
      At least 15 dead as fire rips through Lucknow building, students among victims

      At least 15 dead as fire rips through Lucknow building, students among victims

      Day 3 of CJP sit-in at Jantar Mantar: Dipke steps up attack over NEET row; protesters stay put

      Day 3 of CJP sit-in at Jantar Mantar: Dipke steps up attack over NEET row; protesters stay put

      30 arrested for attempting irregularities in NEET-UG re-exam in Bihar

      30 arrested for attempting irregularities in NEET-UG re-exam in Bihar

    • Health
    • Editorial
    • Sports
    • Writer’s Column
    • Letters to the Editor
    No Result
    View All Result
    • Home
    • Meghalaya
      • All
      • East Garo Hills
      • East Jaintia Hills
      • East Khasi Hills
      • Eastern West Khasi Hills
      • North Garo Hills
      • Ri Bhoi
      • South Garo Hills
      • South West Garo Hills
      • South West Khasi Hills
      • Statewide
      • West Garo Hills
      • West Jaintia Hills
      • West Khasi Hills
      No quick fix to Shillong-Dawki Road collapse

      No quick fix to Shillong-Dawki Road collapse

      Large chunk of Shillong-Dawki Road washed away

      Pynursla BDO warns of further landslides

      Biam ends hunger strike; warns fight for coal mining will intensify

      Biam ends hunger strike; warns fight for coal mining will intensify

      Titos stands behind UDP cabinet musical chairs

      Members come & go but UDP remains strong: Titos

      Government appoints inquiry officer into GHADC issue

      Bernard calls for restoration of autonomy in GHADC

      Bigger Megh House in Vellore to replace current dilapidated facility

      Bigger Megh House in Vellore to replace current dilapidated facility

      College of Community Science transfers food processing technologies to Prime Meghalaya

      College of Community Science transfers food processing technologies to Prime Meghalaya

      Upper Shillong headmen oppose land grant to non-tribal

      NGOs ask for permanent SDO in Dadenggre

      DPDC reviews development initiatives in SWGH

      DPDC reviews development initiatives in SWGH

      Trending Tags

      • North East
      • National
        At least 15 dead as fire rips through Lucknow building, students among victims

        At least 15 dead as fire rips through Lucknow building, students among victims

        Day 3 of CJP sit-in at Jantar Mantar: Dipke steps up attack over NEET row; protesters stay put

        Day 3 of CJP sit-in at Jantar Mantar: Dipke steps up attack over NEET row; protesters stay put

        30 arrested for attempting irregularities in NEET-UG re-exam in Bihar

        30 arrested for attempting irregularities in NEET-UG re-exam in Bihar

      • Health
      • Editorial
      • Sports
      • Writer’s Column
      • Letters to the Editor
      No Result
      View All Result
      Highland Post
      No Result
      View All Result
      Home Writer's Column

      Ranganadi Flood of May 31, 2025: Who is Responsible?

      HP News Service by HP News Service
      June 12, 2025
      in Writer's Column
      0
      The battle for ballot in the North-East
      0
      SHARES
      401
      VIEWS

      By KK Chatradhara

      On May 31, 2025, a catastrophic flash flood struck Assam’s Lakhimpur district, triggered by an excessive discharge from the Ranganadi River. The flood inundated 243 villages, claimed the lives of Biren Pawe and Rajkumar Taid in Nowboicha Revenue Circle, and caused extensive damage to infrastructure, agriculture, and livelihoods. This report integrates data from the 2008 flood and the 2017 IIT Guwahati study to analyze the causes of the 2025 flood and assign responsibility for the downstream devastation.

      The primary trigger was the North Eastern Electric Power Corporation’s (NEEPCO) release of excess water from the 405 MW Panyor Hydro Electric Project (PHEP), compounded by heavy monsoon rainfall, recurrent embankment failures, and ongoing environmental degradation. Historical floods in 2008 (695.20 cumecs, 22 deaths), 2017 (1,412.57 cumecs), and incidents between 2009 and 2015 highlight persistent vulnerabilities and systemic issues in dam management, inadequate warning systems, poor embankment maintenance, and ecological neglect, all contributing to the 2025 disaster.

      The Ranganadi River, originating in Arunachal Pradesh’s Dafla Hills, flows through Assam’s Lakhimpur district. The PHEP, operational since 2001, is a run-of-the-river hydropower project with a 68-meter-high dam generating 405 MW. Its inter-basin transfer diverts 160 cumecs to the Dikrong River, reducing Ranganadi’s natural flow and increasing flood risks during spill releases.

      Causes of the Unusual Peak Discharge in 2025

      Dam Water Release by NEEPCO: The primary cause of the May 31, 2025, flood was NEEPCO’s excessive water release from the PHEP dam. Gate openings escalated from 50 mm on May 29 to 1,250 mm by May 30, exceeding the Ranganadi’s carrying capacity of 1,291 cumecs. This led to a peak discharge that caused the river to overflow by 1:00 AM on May 31. This mirrors the 2008 flood (695.20 cumecs, June 14, 2008) and the 2017 flood (1,412.57 cumecs, July 9, 2017), both driven by sudden releases without adequate downstream coordination. In 2017, NEEPCO’s release surged from 200–300 cumecs on July 8 to over 1,400 cumecs on July 9, as the reservoir reached its maximum level of 567 m, necessitating large releases—a recurring issue in 2025.

      Heavy Monsoon Rainfall: Heavy rainfall on May 30–31, 2025, in Lakhimpur and Dhemaji amplified the flood’s severity, as seen in 2008 and 2017, when monsoon rains combined with dam releases overwhelmed the river. Upstream rainfall in Arunachal Pradesh caused sudden inflow surges, necessitating large releases. Had downstream water level data been monitored, the combined impact of rainfall and releases could have been predicted. This highlights the persistent gap in downstream water level monitoring, unaddressed by 2025.

      Embankment Failure: The breaching of the Mora Singra guide bund at Atichuk and the “ULFA Embankment” at Aamtola in 2025 inundated 243 villages and National Highway 15. Similar breaches occurred in 2008 (10 locations, 7.8 km collapsed near Ujani Khamti) and 2017 at Noinpur (July 9, 2017, 10:00 PM, water level 95.95 m vs. danger level 95.02 m) and Bogolijan (July 10, 2017, 10:45 PM). Between 2002 and 2014, nearly 43 breaches occurred due to overtopping, erosion, and poor maintenance. Inadequate embankment gradients (1:2 riverside, 1:3 countryside) and incomplete geo-mattress coverage, issues persisting in 2025, worsened the situation. Embankments also confine flow, increase siltation, and raise riverbeds, reducing channel capacity and exacerbating breaches.

      Historical Context of Poor Dam and Embankment Management

      The Ranganadi’s flood history, 2008 (695.20 cumecs), 2017 (1,412.57 cumecs), and incidents from 2009 to 2015, reflects systemic flaws, identified as follows:

      Inadequate Inflow Forecasting: Limited rain gauges and a single stream gauging site 10 km upstream, with hourly inflow measurements (updated every three hours), fail to capture the river’s flashy nature.

      Lack of Flood Cushioning: The PHEP, not designed for flood control, prioritizes power production and maintains the reservoir at 567 m, leading to sudden high releases.

      Poor Warning Systems: In 2017, NEEPCO’s SMS alerts provided only 2–2.5 hours of lead time, and eight sirens installed in Assam (2009–2010) were partially non-functional due to power and manpower shortages. Residents reported no siren alerts in 2017 or 2025.

      Sediment Management: Sediment deposition in the river’s central channel forces flow toward embankments, increasing breach risks, as seen in 2008, 2017, and 2025.

      Responsibility for the Downstream Havoc

      NEEPCO bears primary responsibility for the 2008, 2017, and 2025 floods due to:

      * Inadequate Warning Systems: In 2025, warnings were insufficient, as in 2017 (2–2.5-hour SMS lead time) and 2008 (no effective alerts). Non-functional sirens and lack of downstream coordination exacerbated the issue.

      * Excessive Water Releases: The 2025 release (1,250 mm gate opening), 2017 release (1,412.57 cumecs), and 2008 release (695.20 cumecs) exceeded safe river capacities due to poor inflow forecasting and reservoir management.

      The Lakhimpur district administration shares secondary responsibility, as embankment strengthening and siren operationalization were not fully implemented by 2025, perpetuating vulnerabilities seen in 2008 and 2017.

      The May 31, 2025, Ranganadi flood, like those in 2008 (695.20 cumecs, 22 deaths) and 2017 (1,412.57 cumecs), was a preventable disaster driven by NEEPCO’s mismanaged dam releases, heavy rainfall, and inadequate infrastructure. The 2017 IIT Guwahati study’s recommendations to improve inflow forecasting, operationalise sirens, and upgrade embankments were largely ignored, perpetuating vulnerabilities. NEEPCO’s primary responsibility, compounded by administrative and policy failures, demands urgent implementation of these measures to protect downstream communities in Lakhimpur.

      (The writer can be reached at kkchatradhara@gmail.com)

      HP News Service

      HP News Service

      An English daily newspaper from Shillong published by Readington Marwein, proprietor of Mawphor Khasi Daily Newspaper, who established the first Khasi daily in 1989.

      Related Posts

      The battle for ballot in the North-East
      Writer's Column

      Kamai da ka Hok (Earn with Righteousness)

      June 23, 2026
      The battle for ballot in the North-East
      Writer's Column

      PM placing NE on a new high

      June 22, 2026
      The battle for ballot in the North-East
      Writer's Column

      Right To Walk On Safe, Demarcated Footpaths A Fundamental Right

      June 21, 2026
      The battle for ballot in the North-East
      Writer's Column

      Voidance of the Post of Pro Vice Chancellor: To Raze Retirement & Upper Age Limit, Advertisement Appointment Quagmires

      June 20, 2026
      The battle for ballot in the North-East
      Writer's Column

      NEP 2020: Bridging the Theoretical gap between the Practical approach to Entrepreneurship

      June 20, 2026
      The battle for ballot in the North-East
      Writer's Column

      Urja Atmanirbharta: India’s CBG Revolution Must Accelerate

      June 19, 2026
      Load More
      Next Post
      Nepotism – the executioner of bright deserving minds.

      From Reverence to Ruin — A Khasi Call to Conscience Amid Environmental Crisis

      Leave a Reply Cancel reply

      Your email address will not be published. Required fields are marked *

      We’re on Facebook

      Advertisement

      • Trending
      • Comments
      • Latest
      Sonam & Raja were with 3 other tourists on day they vanished, says tour guide

      Sonam & Raja were with 3 other tourists on day they vanished, says tour guide

      June 7, 2025
      Tourist taxi association launches agitation against outside vehicles

      Tourist taxi association launches agitation against outside vehicles

      September 17, 2025
      Residents of 44 localities in Shillong drink unsafe water

      Residents of 44 localities in Shillong drink unsafe water

      October 3, 2023
      Bike taxi drivers ask Govt for offline option

      Rapido captains caught off guard by DTO, hired and fined

      July 7, 2024
      Local cabbies disagree with disruption of tourists’ entry

      Assam taxi operators warn of dire effects of ban from tourist sites

      1

      Illegal sand, boulder mining along Umiam River banned

      0

      WINS project launched at Loreto School

      0
      No quick fix to Shillong-Dawki Road collapse

      No quick fix to Shillong-Dawki Road collapse

      0
      No quick fix to Shillong-Dawki Road collapse

      No quick fix to Shillong-Dawki Road collapse

      June 23, 2026
      Large chunk of Shillong-Dawki Road washed away

      Pynursla BDO warns of further landslides

      June 23, 2026
      Biam ends hunger strike; warns fight for coal mining will intensify

      Biam ends hunger strike; warns fight for coal mining will intensify

      June 23, 2026
      Titos stands behind UDP cabinet musical chairs

      Members come & go but UDP remains strong: Titos

      June 23, 2026

      Recommended

      No quick fix to Shillong-Dawki Road collapse

      No quick fix to Shillong-Dawki Road collapse

      June 23, 2026
      Large chunk of Shillong-Dawki Road washed away

      Pynursla BDO warns of further landslides

      June 23, 2026
      Biam ends hunger strike; warns fight for coal mining will intensify

      Biam ends hunger strike; warns fight for coal mining will intensify

      June 23, 2026
      Titos stands behind UDP cabinet musical chairs

      Members come & go but UDP remains strong: Titos

      June 23, 2026

      About Highland Post

      You’re visiting the official website of Highland Post, a leading and most circulated English daily of Meghalaya published by the Mawphor Group. Stay updated with our e-edition for latest updates from Meghalaya, North Eastern India and World as a whole.

      Registered office:
      Mavis Dunn Road, Mawkhar,
      Shillong-793001, Meghalaya
      Phone no: 0364-2545423
      Email: highlandpost.shg@gmail.com, editorhp2019@gmail.com

      Like Us on Facebook

      Follow Us on Twitter

      Tweets by HP

      © 2021 Highland Post – All Rights Reserved.

      • About
      • Advertise
      • Privacy & Policy
      • Contact
      No Result
      View All Result
      • Home
      • Meghalaya
        • East Garo Hills
        • East Jaintia Hills
        • East Khasi Hills
        • North Garo Hills
        • Ri Bhoi
        • South Garo Hills
        • South West Garo Hills
        • South West Khasi Hills
        • Statewide
        • West Garo Hills
        • West Jaintia Hills
        • West Khasi Hills
      • North East
      • National
      • International
      • Health
      • Editorial
      • Musey Toons
      • Sports
      • Writer’s Column
      • Letters to the Editor

      © 2021 Highland Post - All Rights Reserved.