The newly constructed power sub-station at Rerapara, South West Garo Hills was inaugurated today.
The construction of the 33/11 KV sub-station was funded by the Asian Development Bank (ADB) at Rs 6.19 crore.
The new sub-station is equipped with two 2.5MVA power transformers, control room and a staff barrack.
Before the charging of the new 33/11 KV sub-station at Rerapara, power areas like Damalgre, Melim, Dengnakpara, Okkapara, Grenggandi, Rongbakgre and other adjoining areas get power from the 33/11 KV sub-station at Gongglanggre near Garobadha.
Due to the long and single circuit 11 KV line, the power interruption was frequent.
Chief Minister Conrad Sangma who attended the inaugural function said that the sub-station will ensure a stable power supply in Damalgre and its adjoining villages and would reduce power interruptions.
“Improvement in power supply will enable a conducive atmosphere for stimulating local economic activities, including the establishment of processing units, thereby creating local jobs, which will eventually boost the rural economy,” the chief minister added.
Power Minister Abu Taheer Mondal said that the project will improve Aggregate Technical & Commercial (AT&C) losses and will strengthen the power distribution network.